Readiness

UAV, underwater ROV and robotics readiness

What the authorities publish, read for your job and country, so you can file with the right authority. Our checks read the rules; approvals stay with CAAM, JUPEM and the airport authority.

What a check looks like

Readiness Memo Sample format, illustrative, not a client result

A fictional, unnamed job: a survey firm plans a daytime, visual-line-of-sight mapping flight over farmland in northern Malaysia with one multirotor, and may want to spray later. No client, company or fee is shown.

NIGHTHAWK Readiness Memo · SAMPLE

Job: VLOS farmland mapping flight, northern Malaysia (fictional)

Overall: Amber
StatusCheck, finding and rule source
GreenWhich CAAM approval fits the flight as described
A Standard Authorisation to Fly covers low-risk VLOS/EVLOS flights under 400 ft with no spraying, applied for 14 working days ahead. The described survey flight fits that description.
Rule source: Unmanned Aircraft System (UAS) - CAAM (Reported dataset checked 17 Nov 2026)
AmberAerial imaging permit
Aerial photography needs a JUPEM permit applied for online (eBiz) before the imaging flight. Not yet applied for in this example.
Rule source: Online Application for Aerial Photography Permit - JUPEM (Reported dataset checked 17 Nov 2026, source dated 2024-06-05)
RedAdd-on: crop spraying later in the season
Spraying is outside a Standard ATF. Agricultural operations need a UAWC under CAD 6011 Part II and notice to the nearest agriculture department; a commercial operator needs at least 2 UA. One aircraft is on file in this example.
Rule source: CAD 6011 (II) Unmanned Aircraft System - Agricultural UAS Operations (Reported dataset checked 17 Nov 2026, source dated 2022-11 (upload path))
AmberDrone registration
CAAM has described mandatory registration through a UAS Traffic Management system. Current status to be confirmed with CAAM before the flight.
Rule source: Drones Will Soon Need To Be Registered Before Flying - Lowyat.NET (Reported dataset checked 17 Nov 2026, source dated 2024)

Our checks read the rules; approvals stay with CAAM, JUPEM and the airport authority. The operator files and holds every approval. This sample is a format only: Sample format, illustrative, not a client result.

UAV readiness

What CAAM, CAAS, JUPEM and related agencies publish about authorisations, registration, permits and data capture. Flight-plan quick check, UAV readiness pack, extra aircraft and complex operation pack (BVLOS, SORA, near aerodrome).

Underwater ROV

What the Marine Department Malaysia and the Maritime and Port Authority of Singapore publish about ship and port activity, and how to read a vehicle's published ratings. ROV first-pass and catalogue match with restricted-variant screening.

Robotics

How to check a vendor's published specifications and which safety and radio rules a factory or agency can ask about. Robot spec-claim check and capability profile and spec audit.

What stays the operator's job

The operator files and holds every approval. Government and authority fees are paid by the client directly to the authority. Marine and port permissions stay with the Marine Department Malaysia and the Maritime and Port Authority of Singapore. Radio and equipment marks stay with MCMC, SIRIM and IMDA. In Singapore, civil aviation permissions stay with CAAS.

See the approval paths by country →

Readiness questions

Checked questions, answered on the AEO site